1) The main ships are either been in dry-dock (May 11th --> 20th) or will be next week (May 31st -->?).
or more likely...........
2) Your Scirocco arrived late at the docks and missed the shipping slot. In the past it has taken 4 weeks to recover to get a new allocated slot on board a transport ship. Rare to happen but it does unfortunately. They may have had a problem with the car to solve during production which needed lengthy correction.
C.
Week 43 Build has happened on time! 22 Oct'09 Scirocco is at Check Point 5 in the factory
23 Oct'09 Now Complete on the dockside, 24 Oct'09 Sailed from Portugal, 27 Oct'09 In the UK,
29 Oct'09 at dealersDriving 4th Nov. Sorted!